With Mash Direct in the planning stage of building a new factory facility they ask BL to design and cost new chill and freezer rooms as part of their extension plan. The design included a loading bay area, a dispatch room and a freezer room all to be installed on a 20- week programme.
The design included 3 systems for dispatch and 2 systems in the loading bay and freezer room. A competitive price ensured BL won the contract and the works commenced on site.
All equipment was installed and commissioned to programme to the satisfaction of the client.
Project summary
Project name Mash Direct New factory extension
End user Mash Direct
Consultant in house
Main Contractor Mash Direct
Equipment
Loading Bay
2 off Bitzer LHV7E/4DE-7.F3Y-405
2 off LUVE E45HC 4731 E6
Dispatch
3 off SCM FRIFO MCV B200 BT
3 off LUVE F62HC 2208R 6 CAB.TR
Freezer Room
2 off SCM FRIFO MCV B300 BT
2 off LUVE LS62H 6406 E10 RES-BOC+JB.A-IS