Clean Room Upgrade for Top Northern Ireland Company
BL asked to design and cost a new Clean Room facility with a view to reducing the operational
energy costs and carbon footprint dramatically whilst minimising downtime of the facility.
t: 028 9045 3325
e: info@blgroup.co.uk
environmental systems - efficiently designed - economically maintained
With Mash Direct in the planning stage of building a new factory facility they ask BL to design and cost new chill and freezer rooms as part of their extension plan. The design included a loading bay area, a dispatch room and a freezer room all to be installed on a 20- week programme.
The design included 3 systems for dispatch and 2 systems in the loading bay and freezer room. A competitive price ensured BL won the contract and the works commenced on site.
All equipment was installed and commissioned to programme to the satisfaction of the client.
Project name Mash Direct New factory extension
End user Mash Direct
Consultant in house
Main Contractor Mash Direct
2 off Bitzer LHV7E/4DE-7.F3Y-405
2 off LUVE E45HC 4731 E6
3 off SCM FRIFO MCV B200 BT
3 off LUVE F62HC 2208R 6 CAB.TR
2 off SCM FRIFO MCV B300 BT
2 off LUVE LS62H 6406 E10 RES-BOC+JB.A-IS