Clean Room Upgrade for Top Northern Ireland Company
BL asked to design and cost a new Clean Room facility with a view to reducing the operational
energy costs and carbon footprint dramatically whilst minimising downtime of the facility.
t: 028 9045 3325
e: info@blgroup.co.uk
environmental systems - efficiently designed - economically maintained
With the existing Events Suite air conditioning system ageing and struggling to maintain condition and operating with a large carbon footprint the client decided it was time to do an upgrade.
BL got involved in the design and tender process and offered several solutions from a simple roof top package system replacing the existing like for like to a state-of-the-art air handling system.
The client decided to go the extra mile and install the air handling system solution which although a higher capital cost would reduce carbon footprint and produce energy savings for many years to come.
The logistics of the project proved difficult but working together with the client we installed the plant and ductwork leaving just final connections for a quick changeover at commissioning stage.
The design included using an AHU with 4 No. Toshiba heat pump units with smart controls operating on temperature and CO2 levels to control heating, cooling, and ventilation to the space.
All equipment was installed and commissioned to programme and to the satisfaction of the client with energy savings to be monitored moving forward.
Project name: Function Room air conditioning upgrade
End user: Clandeboye Lodge Hotel
Consultant: Element Consulting
1 No. Markeire AHU at 3.5m3/hr controlling at 21c and 20% relative humidity at 30pascals in room
3 No. Toshiba 20 Kw units for cooling and heating.
Smart control system