Clean Room Upgrade for Top Northern Ireland Company
BL asked to design and cost a new Clean Room facility with a view to reducing the operational
energy costs and carbon footprint dramatically whilst minimising downtime of the facility.
t: 028 9045 3325
e: info@blgroup.co.uk
environmental systems - efficiently designed - economically maintained
The Movie House Yorkgate when it first opened in 1992 was fitted out with Lennox Roof Top Heat Pump packages. These units sat on the roof of the building and provided heating, cooling and ventilation to the 7 individual cinemas.
After expansion in 1997 additional cinemas were fitted with packages which took advantage of the now available gas supply to provide the heating, retaining the refrigeration system for cooling.
In 2008 the original Heat Pump units were replaced after 16 years of service and then in 2017 the remainder of the packages were also replaced completing a 25 year relationship between The Movie House, BL and Lennox.
The pictures show one of the latest units enroute to the roof and then in position.