Clean Room Upgrade for Top Northern Ireland Company
BL asked to design and cost a new Clean Room facility with a view to reducing the operational
energy costs and carbon footprint dramatically whilst minimising downtime of the facility.
t: 028 9045 3325
e: info@blgroup.co.uk
environmental systems - efficiently designed - economically maintained
Commissioned in July 2013 the air conditioning system for this new multi storey hotel in central Belfast has its heating and cooling requirements met by Toshiba SHRM 3 pipe VRF systems.
Neatly tucked above each bedroom door the Toshiba wall mounted indoor units provide cooling and heating for the occupants.
The outdoor units optimise the long narrow plant space available, providing the necessary air clearances and safe secure access.
Belfast Hotel Project
5-Year Peace of Mind Warranty
The complete installation is covered by a 5 year Peace Of Mind warranty underwritten by the manufacturer. Recent developments in this successful warranty scheme have seen the warranty period extended to 7 years. Illustrating Toshiba's confidence in their product and the quality of BL's installations.