News - Recent Projects

The search for energy efficiency, reduced CO2 emissions and a focus on whole life costs has lead to many innovative applications of refrigeration, air conditioning and allied products.

Some recent projects are listed below and further details can be accessed by clicking through.

Copeland Compressors / Emerson Group - Heat Recovery

Recent Projects
4/7/2018

Working closely with the clients energy team BL developed a number of heat recovery projects which utilised a variety of hybrid heat pumps at the Cookstown facility

Mash Direct - Blast Chill

Recent Projects
4/7/2018

As the production at Mash Direct has grown exponentially over the past few years BL have had to provide an ever increasing Blast Chill Facility to cope with the increased volume and variety of freshly cooked produce. Retaining the simplicity of the cook and chill process has required increasingly innovative product handling and flexible control options to ensure that target throughput figures are met.

George Best City Airport - Airedale Chiller

Recent Projects
4/7/2018

As the summer of 2014 approached the chilled water plant serving the Air Handling Units at George Best Belfast City Airport developed major service problems. A rapid replacement of 400 kW of cooling was required to deal with the peak summer load.

Belfast Hotel Project - Air conditioning system

Recent Projects
4/7/2018

Commissioned in July 2013 the air conditioning system for this new multi storey hotel in central Belfast has its heating and cooling requirements met by Toshiba SHRM 3 pipe VRF systems.

Movie House, Yorkgate - Roof Top Heat Pump Units

Recent Projects
4/7/2018

The Movie House Yorkgate when it first opened in 1992 was fitted out with Lennox Roof Top Heat Pump packages. These units sat on the roof of the building and provided heating, cooling and ventilation to the 7 individual cinemas .

University of Huddersfield - Toshiba Air Conditioning

Recent Projects
4/7/2018

The University of Huddersfield needed to air condition new computer access study facilities at its urban campus. Previously similar building additions at this campus had been achieved without installing additional large plant. However, the remote location of the new library pods at the far end of a multi-storey, multi-wing complex meant that it was impractical and uneconomical to extend the central system chilled-water plant. Toshiba MMS proved to be the ideal solution.

Kinnegar - Dehumidifiers

Recent Projects
4/7/2018

The 9th annual Gas Energy Management Awards (sponsored by Phoenix Supply and Invest NI) were held recently in Belfast. The aim of these awards is to celebrate the steps being taken by the local business community to be more energy efficient, and in doing so save money and the environment.

Legacy Building - Gas Fired Heat Pumps GHP

Recent Projects
4/7/2018

When CitiGroup were opening an office in Belfast's new Titanic Quarter their consultants Semple McKillop were instructed to provide an innovative and efficient system to heat and cool the building with an emphasis on low Co2 emissions.

Unit B2
Sydenham Business Park
17 Heron Road
Belfast
BT3 9LE

t: 028 9045 3325
e: info@blgroup.co.uk

SafeContractor-Roundel-R-293x300.png refcom.png construction-line.png quality-environmental-logos.png